Office fit-out is the comprehensive process of preparing a space for operation—from space planning and engineering design to finishes, furniture installation, multimedia systems and commissioning every work area. The owner or tenant receives more than a renovated space: they get a fully operational office ready for employees to move in.
In 2026, indicative office fit-out costs in Moscow start at approximately RUB 100,000–120,000 per square metre for a standard project. A business-grade office may require RUB 150,000–180,000 per square metre, while a premium headquarters with complex engineering and bespoke solutions may cost RUB 240,000–300,000 per square metre or more.
These figures should not be treated as a fixed price list. The final cost depends on the initial condition and size of the premises, the standard of finishes, engineering systems, furniture, schedule and the building management requirements.
The costliest mistake is not choosing high-quality materials, but starting construction without a precise technical brief. Changes are then made during the build, completed work must be redone, and the move-in date keeps slipping.
Below we explain what fit-out includes, how it differs from conventional refurbishment, how long a project takes and how to estimate the budget in advance.
Fit-out is the range of works that turns an empty or partially prepared space into a fully functioning office.
A fit-out may include:
The scope of service may vary from one contractor to another.
One company may use the term fit-out only for design and construction work. Another may also include furniture, connectivity, meeting-room equipment and move management.
When comparing bids, therefore, focus not on the headline cost per square metre but on the detailed scope included in each estimate.
Conventional refurbishment most often focuses on finishes:
Fit-out treats the office as one integrated working system.
A visually attractive finish is not enough. The project must establish:
Refurbishment is therefore one component of a fit-out, but it does not replace the complete process.
Fit-out cost and duration largely depend on the condition in which the space is handed over.
Shell & core is often described as a bare concrete space.
It may include:
Internal partitions, full lighting, floor finishes and internal engineering distribution are generally absent.
The principal advantage of shell & core is complete design freedom. A company can create an office from scratch around its own operating processes.
Disadvantages:
This format suits a company that expects to occupy the office for a long time and wants a bespoke headquarters.
White box is a space with basic preparation completed before final finishes.
Depending on the building, the following may already be provided:
The principal advantage is a reduction in the amount of preliminary construction work.
However, the term white box does not have an identical meaning across all developments. Before committing, obtain a detailed schedule showing what has already been completed, which materials were used and what may need to be redone.
Sometimes the completed base finish does not suit the future layout. In that case, some of the work already paid for by the buyer must be removed.
A completed space can enable a faster move, but it may not suit the new owner.
Check the following:
An attractive interior can conceal engineering limitations. A technical audit is therefore essential before purchasing a completed office.
A detailed property-assessment procedure is provided in the article “How to Choose an Office in Moscow City”.
Suitable for functional offices without complex architectural features.
Typically includes:
The main objective is to create a reliable office within a controlled budget.
This format places higher demands on design, acoustics and engineering systems.
The project may include:
This format is often chosen by companies that need the office to be comfortable for the team while also presenting well in client meetings.
A premium project is developed individually and rarely fits a standard set of solutions.
It may feature:
In a premium headquarters, a coherent architectural concept matters more than the materials in isolation.
Expensive marble will not fix an inconvenient layout, and designer furniture will not compensate for noisy ventilation.
The following benchmarks can be used for preliminary budgeting:
| Project standard | Indicative cost per m² | Typical inclusions |
|---|---|---|
| Basic standard | RUB 100,000–120,000 | Basic finishes, base engineering systems and standard solutions |
| Business grade | RUB 150,000–180,000 | High-quality materials, a complete engineering fit-out, acoustic treatment and meeting rooms |
| Premium | RUB 240,000–300,000 and above | Bespoke design, complex engineering systems and custom solutions |
Prices are indicative and include VAT. The actual estimate may differ materially.
The cost per square metre may exclude:
Before comparing two proposals, therefore, make sure they cover the same scope.
Consider a hypothetical office measuring 1,000 m².
With a budget of RUB 110,000 per square metre:
1,000 × 110,000 = RUB 110,000,000.
With a budget of RUB 165,000 per square metre:
1,000 × 165,000 = RUB 165,000,000.
With a budget of RUB 270,000 per square metre:
1,000 × 270,000 = RUB 270,000,000.
The following costs may need to be added:
For a complex project, it is advisable to allow a contingency of at least 10–15% of the approved budget.
This does not mean the contingency will necessarily be spent. It protects the project from stalling if concealed works are discovered or requirements change.
A fit-out from shell & core is almost always more expensive than adapting a good-quality white box.
However, a poorly executed white box can increase costs if completed elements have to be removed.
Larger spaces can have a lower cost per square metre because some expenses are spread over a greater area.
However, a large-scale office requires:
An open-plan layout is generally less expensive than a cellular office because it requires fewer doors, partitions and separately serviced zones.
However, an open-plan office needs acoustic treatment, phone booths and additional meeting rooms.
Before starting the design, it is useful to review types of office layouts and choose a format that reflects the company’s actual working processes.
Engineering systems can account for a substantial share of the budget.
Particularly costly elements include:
Cutting costs on engineering systems rarely goes unnoticed. Once the office is occupied, the company may face poor air quality, overheating meeting rooms, noisy equipment and insufficient electrical capacity.
The price depends not only on appearance, but also on:
An exclusive material that cannot be reordered quickly may complicate local repairs several years later.
An accelerated fit-out almost always costs more.
The contractor may need to:
Before signing the contract, make sure the proposed programme is physically achievable.
Indicative project durations:
| Area | Indicative total duration |
|---|---|
| Up to 300 m² | 2–3 months |
| 300–1,000 m² | 3–5 months |
| 1,000–3,000 m² | 5–8 months |
| 3,000–5,000+ m² | 8–12 months or more |
The total programme includes more than construction work. It also covers:
If only the visible finishes are counted, the programme will appear shorter. The company cannot move in, however, until ventilation, connectivity, security systems and workstations are operational.
The project does not begin with choosing a wall colour.
Establish the following:
For a preliminary calculation, use the guide on how much office space is required per employee.
Specialists inspect:
The audit should ideally be completed before purchasing the space or signing a long-term lease.
If the space cannot provide the required electrical capacity or air exchange, even an attractive design will be impractical.
The plan should show:
A test-fit layout shows whether the selected floor area genuinely meets the company’s needs.
This stage often reveals that an apparently large office loses a substantial amount of usable area to columns, the lift core and complex geometry.
The concept defines the overall character of the space:
A strong concept connects the interior with business objectives. It should not become a collection of fashionable images that cannot be delivered within the available budget.
Architectural and engineering design packages are developed.
The design package usually includes:
The more detailed the design, the more accurate the estimate and the lower the risk of disputes during construction.
The business centre may impose requirements concerning:
Approvals in a high-rise are usually more complex than in a small standalone office building.
The estimate must be tied to the design documentation.
It is risky to accept a proposal consisting of a single line:
Fit-out — RUB 150,000 per square metre.
The proposal should show:
A separate procurement schedule should be agreed. Some materials and engineering equipment must be ordered well in advance.
The following works are carried out on site:
Completed work should be checked against the design regularly rather than only at final handover.
Engineering systems are tested under operating conditions.
Tests cover:
An empty meeting room may feel comfortable, but temperature and noise levels change when it is occupied. Some tests should therefore be carried out under the design occupancy load.
Once the main works are complete, the following are installed:
Before the move, check every workstation:
The contractor must be able not only to deliver finishing works, but also to manage a complex project.
Request the following:
Attractive photographs do not show how well the contractor maintained the programme and budget.
Speak to previous clients and ask:
Advantages:
The disadvantage is greater dependence on a single contractor.
The company can appoint separate:
This approach provides greater control over pricing but requires a strong project-management team.
If no one is responsible for overall coordination, contractors begin shifting responsibility to one another.
Every late change increases cost.
Changes become particularly expensive after:
Concealed problems are best identified before construction begins.
For key items, agree acceptable substitutes in advance.
The estimate can be divided into three levels:
If savings are required, begin with the third level rather than ventilation or fire safety.
Every change request should include:
Verbal agreements on site almost always lead to disputes.
A well-designed fit-out can reduce future costs if it includes:
A complex interior can also increase maintenance costs.
For example:
The CAPEX required to create an office should therefore be considered alongside future OPEX. Recurring costs are examined in detail in the article on office operating costs.
Fit-out requirements are generally more demanding in a Class A business centre.
The reasons include:
Unauthorised changes to engineering systems can affect not only the office but the operation of the entire floor.
Therefore, when selecting a Class A office in Moscow City obtain the tenant or owner technical guide in advance.
A high-rise office creates additional challenges:
The climate-control design requires particular attention.
A space with panoramic glazing can experience significant solar heat gain, while a 15-person meeting room requires a dedicated air-exchange calculation.
The F-375 office penthouse occupies 2,642 m² across the three upper levels of Federation Tower East.
The space supports a range of working scenarios:
The three levels are connected by a unified architectural and engineering concept. The upper section sits beneath a glass dome approximately 14 metres high.
A project of this scale cannot be assessed solely by an average cost per square metre. The budget is influenced by:
F-375 demonstrates that premium fit-out is not simply expensive finishing for visual impact. It creates an environment in which workplace, management and representative functions form one integrated system.
Detailed specifications are available on the page for the office in Federation Tower.
Purchasing an office gives the company greater freedom:
When leasing, check:
Before making a significant investment, review the complete process for buying an office in Moscow City.
Decisions are made directly on site and change continuously.
Important work items may be absent from the estimate and appear later.
Problems are discovered only after demolition or partition installation.
The design must be revised after it is submitted for approval.
The fit-out is complete, but the company cannot move in for several months.
Management receives an attractive space that is inconvenient for the team’s daily work.
A year later, meeting rooms become private offices and breakout areas become workstations.
The budget omits furniture, equipment, connectivity, relocation and contingency.
Overheating, noise and insufficient fresh air become apparent only after occupation.
Define the team size, working model and functions of the future office.
Check the engineering systems, available capacity, restrictions and condition of the space.
Make sure the office genuinely accommodates all required areas.
Choose a standard, business-grade or premium format.
Prepare the architectural and engineering design packages.
Obtain approval from building management and the relevant specialists.
Compare contractors using the same scope of work.
Allow for design, procurement, construction, furniture and relocation.
Regularly check quality, budget and compliance with the design.
Test all systems before employees move in.
Fit-out is the comprehensive creation of a fully operational office, not merely the finishing of walls and floors.
In 2026, indicative budgets are:
The total programme typically ranges from two to three months for a small space to eight to twelve months for a large headquarters.
An accurate budget can only be established after a technical audit, space planning and completion of the working design.
The key rule is to design workplace processes and engineering systems first, and only then select materials, furniture and decorative solutions.
Fit-out is the comprehensive design, construction, engineering installation and furnishing of an office until it is fully ready for operation.
Refurbishment mainly concerns finishes. Fit-out additionally covers space planning, engineering systems, connectivity, security, furniture and workstation preparation.
A standard project may cost approximately RUB 100,000–120,000 per m², a business-grade fit-out RUB 150,000–180,000 per m², and a premium project RUB 240,000–300,000 per m² or more.
A small office can be completed in two to three months. A large project covering several thousand square metres may take from eight months to a year.
Design, engineering systems, construction work, finishing materials and project management. Furniture, IT and AV systems may be priced separately.
Shell & core offers maximum freedom but requires more time and budget. White box allows final finishing to begin sooner, provided the completed work suits the future layout.
For a complex project, a contingency of approximately 10–15% is reasonable for changes and unforeseen work.
Design can begin once the technical information has been received, but committing funds to construction is safer after the lease is signed and rights to the improvements are documented.